Login ID. Pass.
available database: images, maps
 5781/10973 results | 5778  5779  5780  5781  5782  5783  5784  |          
    "  '  (  1  2  3  4  6  a  b  c  d  e  f  g  h  i  j  k  l  m  n  o  p  q  r  s  t  u  v  w  x  y  z   

Metropole Hotel under construction, Shanghai, September 1930

Title : Metropole Hotel under construction, Shanghai, September 1930

Topic : Other collections

Location : Shanghai: International Settlement

Nature : B&W Photo

Support image : Paper

Caption on print : METROPOLE HOTEL No.3 Date 15/9/30 Messrs PALMER & TURNER Architects & Civil Engineers SIN JIN KEE Building Contractors

Information data : University of Bristol - Historical Photographs of China reference number: BS-s11. Copyrighted image reproduced here with the permission of Teeside Archives. Teeside Archives (Exchange Square, Middlesbrough TS1 1DB, United Kingdom) own the original image. British Steel Archive Project (British Steel Collection) reference number 1264.

Keywords : BSAP;steel;construction;building;architecture;crane;advertising;advert;billboard;poster;Goodyear;tyre;tire;Chrysler;car;vehicle;tram;bamboo;rickshaw;Sikh;policeman

URL :
www.britishsteelcollection.org.uk

Street name : Jiangxi Zhong

 

 

 5781/10973 results | 5778  5779  5780  5781  5782  5783  5784  |          
    "  '  (  1  2  3  4  6  a  b  c  d  e  f  g  h  i  j  k  l  m  n  o  p  q  r  s  t  u  v  w  x  y  z